Development
Connection Permits for new buildings, reconnections, and septic-to-sewer conversions.
A District Connection Permit is required before anyone installs, connects, reconnects, or relocates a service line or grinder pump on a District sewer. The permit makes sure your line is built right the first time and protects your neighbors’ service too.
If a District sewer is within 300 feet of your property line, District regulations require you to connect within 90 days of written notice. Your septic tank must then be pumped, drained, filled with gravel, and abandoned.
🗺️ Find the sewer near you on the GIS Sewer Map →Use the GIS Sewer Map and call us to confirm the sewer type at your property: gravity, low-pressure (grinder pump), or a septic-tank system (STEG in Lakeway, STEP in Emory Creek).
🗺️ GIS Sewer Map →Submit a Connection Permit Application with proof of ownership (deed or tax statement) and a site plan drawn on a GIS map printout. Show the building, service line route, cleanouts, valves, any grinder pump or tank, and water and electric lines. Non-residential properties on private wells need a District-approved water meter before a permit is issued.
🖨️ Connection Permit Application →$1,500 per home or residential unit. Non-residential fees are based on estimated flow at $7.40 per gallon per day. Fees are waived during a District capital project and for one year after it is substantially complete.
You (or your representative), your contractor, and District staff review the requirements and lay out the route. The permit is then issued; post it on the property.
Give us 24 hours’ notice. District staff must see the entire line before it’s backfilled, witness the pressure test, and be present when the main is tapped.
📞 Call (417) 544-0655 →Submit a Central Sewer Billing Application so your account can be set up.
Schedule 40 PVC; 4-inch minimum for homes, 6-inch for commercial; 1% minimum slope; cleanouts within 5 feet of the building and every 100 feet.
Owner-supplied grinder pump with an alarm, located outside the building; 1¼-inch Schedule 80 PVC or CTS; shutoff and check valves near the main.
18 inches minimum cover, No. 12 trace wire, and an air pressure test held for 15 minutes (5 psi gravity, 50 psi pressure).
Exceptions require District approval.
Must carry general liability insurance and a $5,000 utility/permit bond in the District’s name.
Are valid for one year from approval.
The owner owns and maintains the service line, its connection to the main, and any grinder pump.
Full requirements: Rules, Rates, and Regulations, Section 2.07, and the District’s Standard Details.
One RV may connect to your existing service line without an extra monthly charge if it isn’t used as a permanent residence. Additional RVs need a permit, capacity fee, and monthly charge.
Usually not. Each building needs its own service line unless the District approves an exception.
You hire a qualified contractor, and the District inspects the work. During District capital projects, the District installs the connection.
Missouri law requires it, and it’s free.
Building a subdivision or a line that serves two or more buildings? See Sewer Extensions for Developers →