Mildred Phase 2
📍 Quincy and Powell Road area off East Highway 76
About 9,300 feet of sewer and one lift station serving about 56 homes and businesses. Construction began in October 2026 and will take about 12 months.
📋 Project details →Taney County Regional Sewer District
Building and improving the sewers that protect our water.
Capital projects bring public sewer to areas now on septic systems, replace small or failing treatment plants, and keep existing sewers working. They are paid for by the Taney County Sewer Sales Tax, not your monthly sewer bill.
Public sewer for neighborhoods and businesses on septic systems, with priority given to areas near lakes, streams, and private wells.
Connecting small treatment plants to larger regional plants, or replacing or upgrading them, for cleaner water and more reliable service.
Rebuilding older lift stations, pipes, manholes, and grinder pumps, and finding leaks that let rain and groundwater into the sewer.
Where each project stands today. Project pages are added when work goes to bid.
📍 Quincy and Powell Road area off East Highway 76
About 9,300 feet of sewer and one lift station serving about 56 homes and businesses. Construction began in October 2026 and will take about 12 months.
📋 Project details →📍 Highway 160 north of Forsyth toward the H Highway junction
New gravity sewer and two lift stations carrying wastewater to the Rockaway Beach regional treatment plant. Phase 2, the southern section, is expected to bid in 2027, with Phase 3 to the north to follow.
📍 T Highway
The District took over this 138-home subdivision’s sewer system on April 1, 2026. A sewer extension is being designed so the aging treatment plant can be removed, with construction expected to start in 2027.
📍 Near Branson, off Royal Oak Drive
The District owns and operates this subdivision’s small treatment plant and one duplex grinder station on the south side of the development; the neighborhood’s internal sewer lines remain with the property owners’ association. An engineering study will determine whether to upgrade the plant or connect the neighborhood to Branson’s sewer system.
📍 Districtwide
Engineers are evaluating 19 District lift stations that are more than 20 years old. The first priority is the Poverty Point area, where growth is pushing the system to capacity. Upgrades will be built in stages over several years in coordination with the City of Hollister.
📍 North of the Venice on the Lake area, east of Rockaway Beach
The District and the Taney County Commission are reviewing ways to build this area in smaller phases. Updates will be posted here.
About 13,000 feet of force main and two lift stations serving the Thunder Ridge Nature Arena, with capacity to serve nearby properties and retire the Branson Cedars treatment plant.
Collection system and treatment plant upgrades for the subdivision. The upgraded plant now consistently meets its permit limits and is no longer in enforcement with the Missouri Department of Natural Resources.
Final phase of the Ridgedale project, connecting the Country Farm Estates subdivision.
The District’s Master Plan ranks future projects by:
The Master Plan is being updated and will be posted here when adopted.